In this specific project, our company was asked to integrate the air conditioning system into the particular architectural style of the construction and into the choices that had already been made during the construction of the building. It is a building of innovative architectural design that takes full advantage of bioclimatic design.
JAGA floor ducts were selected and installed during construction for the air conditioning of the building. We were called upon, taking the specific installation as a given, to recommend the appropriate heat pump, to design the cooling/heating machinery room, to install and also commision the specific systems.
A low-temperature heat pump with a nominal power of 16kW, from the Daikin company, was installed, the floor channels were checked and maintained and the commision of the installation was executed.
It was a great pleasure for the Four Seasons Klimaengineering team to participate in the completion of such a special and pioneering project.
Waste water treatment units
State-of-the-art waste biological treatment systems for volumes ranging from a single house to a hotel